|
One priority of IBS' activities
is the development, installation and support of planning systems
for local and long-distance railways.They are based on programme
systems granted during a long-term consulting and determined for
infrastructure and operational planning (SIMU, BAUPLAN and Bfo-FfZ),
for track maintenance planning (REIHPLAN) as well as for running
time calculation.
These programmes allow railway employees who work on system planning
and system control to achieve the utmost of existing capacities
and to increase considerably the productivity and quality of planning
and control processing.
|
|
|
|
|
|
|
Product information |
|
|
|
|
Simulation |
Simulation of railway networks |
SIMU |
|
|
Maintenance-site time table-design system |
BAUPLANplus |
|
Timetable planning |
|
|
| |
Coordination
of maintenance sites |
REIHPLAN
plus |
|
| |
Construction of station-diagrams |
Bfo-FfZ |
|
Operational planning |
|
|
| |
Rolling stock
scheduling |
TaBu |
|
|
Maintenance planning |
Track description system |
e.rail |
|
| |
|




|